Trail Maintenance 01/2007
The Plan C, Rumpy Bumpy and Barakuda trails are in bad shape, after DBKL widen the trails to accommodate horses.
DBKL just widen the trails, but didn't carry out any soil compacting work. The result is just muddy and soft trails, and unsuitable for mountain biking. It is also probably not suitable for horse riding.
In my opinion, the Plan C and Rumpy Bumpy trails are important trails in Bukit Kiara. Both of them give access from Hartamas to Taman Tun Dr. Ismail and vice-versa. They need to be in good condition.
Friday, 20 April 2007 is also a birthday for my friend, Normy Marziah. I send her SMS for birthday wish. But, it's also the day that I committed to repair Plan C.
These are what I did:
1. Six trail-side retainers with compacted soil filling,
2. About 15 meters of soil transfer and compacting (uphill).
3. Four on trail retainers.
It was a little bit though job because it rained heavily the night before. This made the the soil muddy and heavy. It was also difficult to compact them. I just hope the weather is dry today so that the compacted soil bed in.
It took me about 3 hours, 1.5 liters of isotonic drink (Excel) and lots of layers of mosquito repellent.