05 February 2008

Bukit Kiara Replacement Trailworks - Plan C

The Plan C trail which connects Sri Hartamas to Bukit Kiara trail network was destroyed by the new 3 meter (plus) wide horse trail built the Dewan Bandaraya Kuala Lumpur (DBKL) or Kuala Lumpur City Council.

[The 3-meter + wide rotten horse trail]

There were 25 people gathered to do their parts in building the new replacement trail. After the safety briefing, the guys were divided into several groups; one to open up the path and do the finishing job, one group to clear the big stuffs like fallen trees or boulders and one group to dig and carve the trail.

Each group had their leader, but the trail master is Pat. This is also my first time being a leader for one the group. Great experience !!

Here are some the pictures taken by several of the trail crews.












According to the Pat, we managed to open up 450 meters of trail and only another 50 meters were left out.

After the hard work, me and my beloved wife Laily setup a small barbeque of Ramlee burgers, frankfurters and breads. She also pre-cooked baked chicken, simple twisted pasta and chicken & mushroom quiche. To replenish the lost water and salt from the body, the isotonic drinks and watermelons were also served.